BILINGUAL REPORT – COMMUNITY FEEDBACK HELPS VCPWA RECEIVE FIRST STATEWIDE GRANT FOR PEDESTRIAN IMPROVEMENT PROJECT
Bilingual report — Community Feedback Helps Ventura County Public Works…
Transportation is responsible for the planning, designing, funding, building, operating and maintaining the County Road System, approximately 542 centerline miles of roadway, bridges, drainage and related transportation facilities, coordination of unincorporated area public transit needs, and provision of general transportation advice to the Board of Supervisors.
The County-maintained Road System is spread throughout the unincorporated territories of the County as far west as the community of La Conchita, as far north as Lockwood Valley, east to several roads in the Malibu mountain areas and roads in the Santa Susana mountains, and several hundred miles of roadway in between.
Transportation’s priorities are public safety – ensuring that our roads are safe for use when used with due care in a manner in which it is reasonably foreseeable that they will be used; and preservation of infrastructure – preserving and maintaining the public’s multi-billion-dollar investment in the roads, bridges, and other facilities associated with the County Road System. When funds are available, we strive to make operational improvements to specific areas of the Road System as detailed in the Public Works Capital Improvement Plan.
Bilingual report — Community Feedback Helps Ventura County Public Works…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Pidduck Road ESTIMATED…
Santa Ana Boulevard Bridge replacement gets closer Details Published: Friday,…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Sulphur Mountain Road West…
Bilingual report — Navy and Ventura County Enter into a…
Ventura County is applying for a grant to install rumble…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Old Telegraph Road ESTIMATED…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Sulphur Mountain Road ESTIMATED…
TRANSPORTATION PROJECT DESCRIPTION Santa Ana Road Slope Stabilization ESTIMATED…
TRANSPORTATION PROJECT DESCRIPTION Grand Avenue Bridge Replacement #427 ESTIMATED CONSTRUCTION…
TRANSPORTATION PROJECT DESCRIPTION Bradley Road Bridge Replacement #206 ESTIMATED CONSTRUCTION…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Lockwood Valley Road (West)…
TRANSPORTATION PROJECT DESCRIPTION Horizontal Curve Warning Signs Countywide CONSTRUCTION…
TRANSPORTATION PROJECT DESCRIPTION Rose Avenue Bike Lanes ESTIMATED CONSTRUCTION COST…
TRANSPORTATION PROJECT DESCRIPTION Yerba Buena Road Slope Repair MP…
TRANSPORTATION PROJECT DESCRIPTION Tapo Canyon Road Slope Repair ESTIMATED…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Lockwood Valley Area (East)…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Lewis Road Oxnard…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – El Rio Area…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Ventura Area ESTIMATED…
TRANSPORTATION PROJECT DESCRIPTION Pavement Resurfacing – Simi Valley Area…
Southern California Gas will be performing pipeline construction work at…
Southern California Gas will be performing pipeline construction work at…
TRANSPORTATION PROJECT DESCRIPTION Hueneme Rd Corridor Traffic Signal and Safety…
TRANSPORTATION PROJECT DESCRIPTION Avocado Place Culvert Replacement MP 0.25 ESTIMATED…
VCPWA’s Transportation Department has recently completed a project to improve…
TRANSPORTATION PROJECT DESCRIPTION Bridge Road Bridge Rehabilitation County Bridge #442 ESTIMATED…
The Thomas Fire of December 2017 devastated our community of…
The Transportation Department is working on a number of projects…