LEWIS ROAD SLOPE REPAIR

TRANSPORTATION  PROJECT DESCRIPTION Lewis Road Slope Repair ESTIMATED CONSTRUCTION COST $460,000 CONST.  START DATE April 2023 CONST.  END DATE June 2023 PROJECT MANAGER/ DESIGN ENGINEER Terry Hanser CONTACT NUMBER 805.654.3770 Lewis Road Slope Repair Project Location Map

Public Works

LOOP DRIVE STORM DRAIN REPAIRS

TRANSPORTATION  PROJECT DESCRIPTION Loop Drive Storm Drain Repairs ESTIMATED CONSTRUCTION COST $270,000 CONST.  START DATE June 2023 CONST.  END DATE August 2023 PROJECT MANAGER/ DESIGN ENGINEER Sohil Bhakta CONTACT NUMBER 805.654.3987 Loop Drive Storm Drain Repairs Project Location Map